Project: South Bahrain Loop Road
Value: BD 11.297 Million
Year : 2021 March -2021 December
The Project Consisted of the development of South Bahrain Loop Road ( SBLR) as a link between Gulf of Bahrain Avenue with Al Sahel Resort for an approximate length of 10Km, HHG executed 5km of the project.
The New road was constructed as a dual two-lane carriageway with 3m hard shoulder on both lanes, (24.1m between 2 outer shoulder edges).
The Scope of Drainage works included construction of Culverts, 1200mm dia twin pipes, and a Lift station.