Project: North Manama Causeway Project
Value: BD 98 Million
Year : 2010-2013
NMC project included upgrading of King Faisal Highway/ Al Fateh highway Jn. into a 2 level Grade separated Junction, by constructing an elevated Flyover.
The major elements in the project are as follows:
Construction of glued segmental viaduct 1.42km long single cell box girders.(two adjacent bridges side by side)
A loop flyover ,8 span 237m long prestressed concrete viaduct.
A single span 51.5m long prestressed concrete bridge over the Architectural canal.
Construction of 2.42km causeway road on reclaimed land, and reconstruction of 1.6km of existing road.
All related services like drainage, water supply, street lighting, telephone etc.
Type of Contract: The project was executed in Joint Venture with Six Construct/ Haji hassan Group