Skip to content
  • Home
  • About Us
    • Founder’s Message
    • Director’s Message
    • Company Profile
    • Core Values
  • Capabilities
    • Highways Roads and Infrastructure
    • Airports and Race Tracks
    • Bridges and Landmark Projects
    • Pipeline Construction
    • Sewage Treatment Plants and Pumps Stations
  • Resources
    • Offices, Workshop and PMV Facilities
    • Equipment Fleet
    • Staff Manpower
  • Projects
  • QHSE
    • Certifications
  • Affiliates
  • Contact Us
    • Careers
Menu
  • Home
  • About Us
    • Founder’s Message
    • Director’s Message
    • Company Profile
    • Core Values
  • Capabilities
    • Highways Roads and Infrastructure
    • Airports and Race Tracks
    • Bridges and Landmark Projects
    • Pipeline Construction
    • Sewage Treatment Plants and Pumps Stations
  • Resources
    • Offices, Workshop and PMV Facilities
    • Equipment Fleet
    • Staff Manpower
  • Projects
  • QHSE
    • Certifications
  • Affiliates
  • Contact Us
    • Careers

Project: SH. Zayed Highway Improvement

Value: BD 19.4 Million
Year : 2019-2021

Upgrading of Existing Sh. Zayed highway, Salmabad Bypass and 16 December highway into three lane dual Carriageway with at grade signalized junctions including storm water drainage, HV /LV diversions, Street lighting etc. Total length of three lane highway improvement was 8.25km

The Project Consisted of 4 Sections as follows:

Section 1- Sh. Zayed Highway Improvement –East: Improvement of 16 December Highway for a length of about 1.8km

Section 2- Sh. Zayed Highway Improvement –West: Improvement of 3.2 km from Sh. Khalifa bin salman highway to Sh. Salman highway.
Existing two-lane carriageway with two roundabouts was modified to three lane dual carriageway with two grade signalized junctions.

Section 3- Sh. Zayed Highway Improvement –North: Improvement of 3.2 km of Salmabad bypass or Avenue 12.
Existing two-lane carriageway with two roundabouts was modified to three lane dual carriageway with two grade signalized junctions.

Sewerage Works:
The scope for sewerage works included Construction of 950 l/s capacity submersible lifting station (12m x15mx15m depth) within the boundary of Salmabad (Ramli) Housing and Construction of a new 1200mm diameter (approximately 1.2 km long) gravity trunk sewer along Avenue 12. 

BAE is a leading general contractor based in the Kingdom Of Bahrain.

Quick Links

  • About Us
  • Capabilities
  • Resources
  • Projects
  • Contact
  • About Us
  • Capabilities
  • Resources
  • Projects
  • Contact

Capabilities

  • Roads and Infrastructure
  • Airports and Tracks
  • Landmark Projects
  • Pipeline Construction
  • Plants and Stations
  • Roads and Infrastructure
  • Airports and Tracks
  • Landmark Projects
  • Pipeline Construction
  • Plants and Stations

Contact us

  • +973 17 556 556
  • +973 17 556 084
  • [email protected]
  • PO Box 530, Manama, Bahrain

Copyright © Bahrain Asphalt. All rights reserved.

  • Follow us on social media